The I-69 corridor serves as a critical rural freeway connecting Flint, Port Huron, and local communities such as Lapeer, Imlay City, and Attica Township. Within the project limits, I-69 featured two lanes in each direction. This project included the reconstruction of freeway lanes and shoulders from Lake George Rd. to Newark Rd., encompassing the S. Lake Pleasant Rd. interchange ramps, which were rebuilt as a rural diamond interchange.
Scope of Work:
As a subconsultant, VE was responsible for various design tasks related to traffic management and signing:
Scope of Work:
As a subconsultant, VE was responsible for various design tasks related to traffic management and signing:
- Designed Traffic: Work Zone Maintenance of Traffic
- Designed Traffic: Work Zone Mobility & Safety
- Designed Traffic: Signing - Non-Freeway
- Designed Traffic: Signing - Freeway
- Developing a general concept of Maintenance of Traffic (MOT)
- Staging typical cross-sections
- Conceptualizing detour route concepts
- Conducting work zone mobility analysis
- Analyzing Maintenance of Traffic concept costs
- Drafting and Final MTSP (Maintaining Traffic Special Provision)
- Developing Traffic Management Plans (draft and final)
- Designing MOT staging and layouts
- Creating temporary signing, crossover, drainage, and guardrail designs
- Planning detour route layouts
- Detailing miscellaneous aspects and providing an engineer’s opinion of probable cost
- Designing the permanent signing layout
- Creating special signing designs and details (SignCAD)
- Compiling an index to Notice to Bidders (NTB), Frequently Used Special Provisions (FUSP), and Supplemental Specifications (SS)
- Estimating quantities and providing an engineer’s opinion of probable cost
- Compiling the Project Quantity Spreadsheet (PQS)
- Preparing Reference Information Documents (RID)
- Finalized 100% crossover model
- Final deliverables and supplemental documentation (quantity books and engineering calculations)